Past Performance

VKW Construction LLC - Peter Rowlett - TA Truck Stop #1605

  • Public Restroom Updates
  • Remove plumbing fixtures
  • Remove toilet / unrinal compartments
  • Remove vanity & sinks
  • Trims
  • Fixtures - faucet
  • Mens Restroom - touchless faucet
  • Reset toilets / urinals in Restrooms (Verify if wall mount. Need carriers) Include wax ring & supply line
  • Install Sinks in Restrooms (Include P-traps, supply lines, caulk, escutcheon)
  • Bath accessories
  • Install toilet compartments
  • Driver's Shower Stall Updates
  • Remove plumbing fixtures
  • Remove Toilet Accessories
  • Fixtures - faucet
  • Shower Plumbing (Includes mixing valve trim kits)
  • Replace toilets in showers (Include wax ring and supply line)
  • Install sinks in showers (Include P-traps, supply lines, caulk, escutcheon)
  • Install owner provided Bath accessories

  • Start Date: Jan 04, 2022
  • End Date: 03/01/22
  • Value: $20,000.00
  • Contact Phone: Provided upon request

Balfour Beatty

Replace all interior water lines in the Community Center @ Altus Air Force Base

  • Start Date: Mar 10, 2023
  • End Date: 05/25/23
  • Value: $10,000.00
  • Contact Phone: Provided upon request

Eric and Amber Schmitt

  • Replaced collapsed sewer line under slab
  • Labor (under the following flooring: east bedroom, east bathroom, dining room, laundry room, into the living room to gain access to the kitchen line, and two west bathrooms) (Plumbing only)
  • Replaced collapsed sewer line under slab
  • Parts and materials (under the following flooring: east bedroom, east bathroom, dining room, laundry room, into the living room to gain access to the kitchen line, and two west bathrooms) (Plumbing only)
  • Replace flooring in areas where concrete was excavated
  • Labor and material
  • Remove existing flooring and resurface concrete for flooring (prep work)
  • Labor and material
  • Excavate area outside to tie into existing sewer line
  • Parts, materials, and equipment
  • Labor and materials
  • Cut, jackhammer, excavate, and pour concrete (this includes rebar supports and sand backfill)
  • Labor and materials

  • Start Date: Dec 12, 2022
  • End Date: 04/20/23
  • Value: $70,000.00
  • Contact Phone: Provided upon request